Kia Soul EV: High Voltage Battery System / Quick-Charger Relay Assembly (QRA) Repair procedures
QRA is integrated into the high voltage joint box and so each
part cannot be replaced separately. Refer to removal procedure of high
voltage joint box. |
QRA is integrated into the high voltage joint box and so each
part cannot be replaced separately. Refer to removal procedure of high
voltage joint box. |
Description
Quick Charge Relay Assembly (QRA) is installed in the high
voltage joint box and it consists of main relays which control the high
voltage. The QRA controls the high voltage between ...
Removal
•
Be sure to read and follow the “General Safety Information
and Caution” before doing any work related with the high voltage
system. Failure t ...
Other information:
Component Location
1. Front seat belt pretensioner
...
Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the temperature control actuator connector.
3.
Verify that the temperature control actuator operates to the
cool position when 12V is connected to terminal 3 and ground to terminal
7.
Verify that the temperature control actua ...