Other information:
Inspection
1. Vcc2. Ground
Check the voltage between terminals 6 and 7.
1.
Using the tester, check the resistance between terminals 1 and 2.
TemperatureResistance [K?]°C°F-30-228.7~9.5-25-138.92~9.74-20-49.14~9.98-1559.37~10.23-10149.59~10.47-5239.81~10.7103210.03~10.9554110.25~11.191 ...
Replacement
•
Put on gloves to protect your hands.
•
When prying with a flat-tip screwdriver, wrap it with
protective tape, and apply protective tape around the related parts, to
prevent damage.
•
Ta ...