Kia Soul EV: Heating,Ventilation, Air Conditioning / Specifications

Kia Soul EV (PS EV) 2015-2020 Service Manual / Heating,Ventilation, Air Conditioning / Specifications

Specification
Air Conditioner
Item
Specification
Compressor
Type
ESC33n (Electric Scroll)
Communication type
CAN communication
Oil type & Capacity
POE OIL, 180±10g
Motor type
BLDC
Rated voltage
360V
Operation voltage
240~413V
Displacement
33cc/rev
Condensor
Heat rejection
13,400 -3% kcal/hr
Air pressure transducer
Pressure value
Voltage=0.00878835*Pressure(psig)+0.5
Expansion valve
Type
Block type
Refrigerant
Type
R-134a
Capacity
Without heat pump
550±25g (19.4±0.88 oz.)
With heat pump
900±25g (31.7±0.88 oz.)

Heater And Evaporator Unit
Item
Specification
PTC Heater
Type
Fin & Tube type
Operating voltage
DC 240V ~ 420V
Heating capacity
4,700 ± 5% kcal/hr
Heat Pump
Exterior Condensor
Heating capacity
17,000 - 3% kcal/hr
Interior Condensor
2,600 - 5% kcal/hr
Chiller
770g
Accumulator
950cc
Mode  operating type
Actuator
Evaporator
Temperature operating type
Actuator
Temperature contorl type
Evaporator temperature sensor
A/C ON/OFF
ON : 2.3±0.5°C, OFF : 0.6±0.5°C
Heating capacity
4,700 - 5% kcal/hr

High Voltage Shut-off Procedures
High Voltage Shut-off Procedure     Be sure to read and follow the “General Safety Information and Caution” before doing any work related with the high voltage syst ...

Special Service Tools
Special Service Tools Personal Protective Equipment NameIllustrationDescriptionInsulation glovesUsed when inspecting or working on the high voltage components[Insulation performance : 1000V / ...

Other information:

Kia Soul EV (PS EV) 2015-2020 Service Manual: Repair procedures


Replacement 1. Remove the cap (A), the nuts and the wiper arm (B). Tightening torque : 22.6 ~ 26.5 N.m(2.3 ~ 2.7 kgf.m, 16.6 ~ 19.5 lb-ft) 2. Remove the glue from both ends (A) of the hood weatherstrip. 3. Disconnect the cowl top cover nozzle hose (A). 4. Detach the clips, then ...

Kia Soul EV (PS EV) 2015-2020 Service Manual: High Voltage PTC Heater Repair procedures


Inspection 1. Check for output signal in the heater and A/C control unit. 2. Using the GDS, check whether there is a problem in the interlock. 3. Check whether the low voltage (12V) is supplied or not. 4. For inspection, refer to the Self Diagnosis and Fail Safe. Replacement ...

Copyright © www.ksoulev.com 2020-2022