Inspection
•
Be sure to read and follow the “General Safety Information
and Caution” before doing any work related with the high voltage
system. Failur ...
Inspection
1. Vcc2. Ground
Check the voltage between terminals 6 and 7.
1.
Using the tester, check the resistance between terminals 1 and 2.
TemperatureResistance°C°FSpecification [K?]Tolerance [%]-40-40225.1± 3.06-30-22129.3± 2.49-20-476.96± 1.95-101447.34± 1.4603230± 1.00 ...